On the 1st floor there is a swimming pool 25x16m (6 lanes), a block of sauna premises (dry heat steam room), entrance groups for those involved, administrative premises, referee and coaching rooms.
On the 2nd floor there is a gym, changing rooms and showers, a medical block.
On the 3rd floor there is a gaming room 34x21 meters, administrative offices, referee and coaching rooms, and a massage room.
Previously, the students of the school named after A.Ya. Gomelsky had at their disposal only an educational boarding building - a separate platform for basketball training, but there was no swimming pool, universal games room and gym. Now the future champions have a modern, spacious sports complex, decorated in accordance with the style of the school. The design takes into account the corporate colors of the professional educational institution - orange, gray and purple.
Now the “sports territory” is adjacent to the “study territory” and athletes can fully increase their sports potential.
Moscow, st. Leskova 25a
CP "BSA "Luzhniki"
A. R. Asadov, I. V. Malyshkin
I. V. Malyshkin, G. A. Basirov
P.Yu. Rodichenko, Yu.V. Kushner.
Z. V. Kryazhkov, M. V. Voronkova
2022
Plot area - 0.6953 hectares
Construction area - 1997.4 m2
The total area of the facility is 6736.1 sq.m.
Total construction volume - 37629.6 m3
Number of floors: 3 floors + basement + technical floor
Number of parking spaces - 18 seats
Capacity - about 600 people per day